Feasibility first
Before any design work begins we test the idea against the site. Orientation, access, slope, planning constraints and what you actually want the house to do. It is a low-risk stage by design, because it is the cheapest point to discover a problem.
Design and documentation
This is where the time goes. Panelised construction means components are cut before anyone arrives on site, so decisions have to be resolved on paper rather than improvised later. Orientation, glazing and shading are set here.
Assembly
Panels arrive as a kit and the shell goes up in days. What would normally be weeks of framing becomes a short, controlled sequence.
Verification
When the house is finished we test it with a blower door and a thermal camera, and hand you the results. Then you move in.